Examination of Witnesses (Questions 4700
- 4719)
4700. CHAIRMAN: You say "we",
who is "we"?
(Mr Schabas) I was retained by Union Railways which was the
Government's Promoter for the Channel Tunnel Rail Link project,
and we were facing environmental legislation really for the first
time, but we were very keen not to get, I guess, into this kind
of debate here actually. We thought, "Let's just do our job,
let's look at the reasonable alternatives. We don't really care
that badly which route we go on. We don't have a set view. We
would just like to build a railway, so, if there is a better route,
let's find it". In the case of Ashford, for example, there
was a strong view that we should go around Ashford and then quite
late in the process actually we changed and went through the middle
of Ashford because, although it turned out to be a bit more expensive,
it was better in other ways. I do not remember the details exactly,
but this was the case all along CTRL and we had a common point
in that it had to come from the Channel Tunnel and it had to go
to London. We even changed the terminal, as you know, from King's
Cross to St Pancras quite late in the process, but again it was
identifying alternatives and the job was, "Let's get them
out, let's get the alternatives out so that people can see them.
Let's expose what we can tell about them, how much they cost.
Obviously if there is a fatal flaw, if the scheme means tunnelling
under the NatWest Tower, then it is probably not going to work,
it'll be very expensive, but, otherwise, let's tease out the alternatives
and let's run with the ones that look serious". Obviously
you could come up with hundreds of alternatives and that was not
the point, but, "Let's try harder to find three or four realistic
ones which have sort of the main differences, the dominant alternatives".
Looking here, coming from Liverpool Street and going to Whitechapel,
it is pretty obvious that Whitechapel Road is pretty straight
4701. MR HORTON: Just while you are saying
this, I have put up a plan which I showed the Committee yesterday,
taken from the Eastern Portal Bow Triangle Option Study dated
28 March 2001 and it may help if you speak by reference to it.[11]
(Mr Schabas) Clearly, one alternative, which
is the one the Promoters selected, swings to the north and uses
as much of the old safeguarded route out of Liverpool Street as
possible and gets it as close as they could to the railway and
I think they were planning to use it for construction and to have
the conveyor, which they eventually dropped, but of course it
goes under an historic area. It is more low-rise buildings, but
there are some buildings with pile foundations that it goes underneath
and that is the route they selected. Whitechapel Station is not
ideal actually. If you look at the model, you can see that the
pedestrian interchange is quite poor and it is only the one connecting
tunnel between the two stations and of course you have the curve
at Liverpool Street which adds, I am told, three seconds which
is worth a few million pounds in the lifetime of the project,
which is probably not very important, but I am not sure, I do
not see that written on a sheet of paper anywhere in the table.
I would expect to have seen, and on Channel Tunnel Rail Link we
would have produced, a table saying, "Now, there is alignment
B which has a different interchange", and, looking at it,
I think possibly a better interchange at Whitechapel could be
created because you are right alongside the existing station,
although you are underground. It goes under buildings of really
little historical interest because the Whitechapel Road area was,
I think, pretty much all cleared by the Luftwaffe. It does go
under some buildings with pile foundations along Whitechapel Road,
mostly four-storey buildings, and I guess in the extreme case
you could even demolish one of these, but I think the engineers
should be able to get through and under that kind of a problem.
There are the issues right up at Bishopsgate about the Heron Tower
and the other proposed towers which were just proposals at the
time.
4702. CHAIRMAN: One of them has got planning
permission now.
(Mr Schabas) Yes, one of them is under construction now.
4703. MR HORTON: Mr Schabas, the one
which has planning permission, if I may lead, is Heron Tower.
Is that right?
(Mr Schabas) I believe so. I believe it is under construction,
but I think also the plan indicates that does not actually necessarily
conflict with it even as it is now being built. It seems to me
back when this study was done --- I am surprised they kept it
secret, that would be the first thing. Why did they not
4704. MR HORTON: Can you just look at
this plan on the screen.[12]
The brown is the site of Heron Tower, I am instructed.
4705. MR ELVIN: What was this map?
(Mr Schabas) That was the Heron Tower site there, I believe,
and the Alignment B is that tunnel there which goes pretty close
to it but appears to miss it.
4706. LORD YOUNG OF NORWOOD GREEN: It
goes under it.
(Mr Schabas) No, that one (Indicating).
4707. CHAIRMAN: Route C goes under it;
Route B does not.
(Mr Schabas) That is C and that is B (Indicating). Of course,
it does go under Cutlers Gardens which has some eight and ten-storey
buildings and some other old buildings.
4708. MR HORTON: Just pause there. Is
Cutlers Gardens an entirely new development?
(Mr Schabas) This part is new, this part is old (Indicating).
If this route did not exist --- I worked with engineers on rail
projects in different cities and projects that have been built,
they would have found a way to go through here or under here (Indicating).
I would have thought that if you were promoting this scheme back
in 2000, 2001, 2002, you would say, "I want to go from Liverpool
Street to Whitechapel. What are the pros and cons of the different
routes?" But it does not appear they did that.
4709. MR HORTON: Can we compare that
plan which shows the actual Heron Tower site, which is now under
construction with a public highway on the north sideI am
pointing with my pen, if that is acceptable therewith a
plan which the Promoters produced to a letter dated 4 March 2007
from my learned friend, Mr Elvin?[13]
4710. MR ELVIN: Can I have the reference
of it?
4711. MR HORTON: Yes, it is page 16 in
the Petitioners' bundle of documents. Has that road been shown
on this plan of the Promoters (Indicating)? Does it help to compare
the two?
(Mr Schabas) Yes, they are showing the development as blocking
up their road.
4712. Whereas, as you understand it, in fact
does the Heron Tower site extend over that roadway, which I point
to with that pen (Indicating)?
(Mr Schabas) I do not think it does.
4713. MR HORTON: No, thank you. May I
ask you a question on a matter you spoke to a moment ago. It may
be helpful for this purpose to go toI have it put up on
the screenthe passage in the March 2001 report. Sorry,
it is so heavily marked, my Lords and my Lady. We know that Alignments
B and C are set to pass below known piled buildings, proposed
developments and then there is a reference to a planning application,
Stone House and Staple Hall, subsequently withdrawn. In your experience,
is the fact that a site happens to be the subject of a planning
application, let alone a withdrawn planning application
4714. CHAIRMAN: Mr Horton, it does not
matter. We are dealing with the situation as it is today.
4715. MR HORTON: Certainly, thank you,
my Lord, but of course such a situation could recur. I am just
taking the point of principle.
(Mr Schabas) It would, though. I think
it is right to put that in there because you try to design your
project not to interfere with likely or proposed development as
well. To me that is a perfectly valid thing to say, "There
is a development site there, we'd like to avoid it", because,
although they have withdrawn their application, they are going
to come back and try again. I would like to see that on a table
where somebody says, "Oh, but by the way we can go over the
other route, we go under Spitalfields". There is nothing
comparative here. Everything is absolute. They are saying what
is not right about this route and they are not weighing it with
the alternatives. It goes under known pile foundations, so does
the route that they are proposing to build. Is one better or worse,
that is the comparative work and nowhereand this applies
to the other places on Crossrail where they are being challenged
on the routethey do not make a comparative evaluation,
they just tell you what is wrong with it. Of course any railway
under an urban area is going to have lots of things wrong with
it, but I cannot tell whether this is better or worse than the
one they are promoting and, frankly, I suspect this may be better
than the one I have seen.
4716. Why do you, as you say, suspect that B
might be better?
(Mr Schabas) I think the reason they went
the other way was to be near the tunnelling site, it was to do
with their tunnelling strategy. They got into that strategy and
they have changed the tunnelling strategy and they do not want
to go back and start re-opening a can of worms. That is one of
the risks you always face in these projects: you make a decision
early on that sends you down one route and you say, "Oh my
God, you know, the reason we did it has changed. Maybe we should
have gone the other way". Honestly, I cannot tell. I think
they rushed the early stages in the process.
4717. Do you know anything about comparative
lengths?
(Mr Schabas) I believe Route B is shorter, it is more direct,
it would have less speed-restricting curves, it would cost less
to run and it does not go under a historic area.
4718. On the face of it.
(Mr Schabas) On the face of it, it looks like something ---
Its disadvantage is it appears to go near to some development
sites with substantial buildings that were planned, one of which
is now being built, but it does not appear that it necessarily
even conflicts with that now.
4719. You referred the Committee earlier to
your view that if a route, in fact, has to go under buildings
with piled foundations, in certain circumstances Promoters will
consider purchasing that building. What is the reason for that?
(Mr Schabas) I am saying that in the worst case that is what
you can do. If it is not a major building
11 Committee Ref: A28, CrossRail Eastern Portal-Bow
Triangle Option, CrossRail Tunnel Alignments between Liverpool
Street and Bow Triangle (SCN-20080313-014) Back
12
Committee Ref: A26, Alignment Options A, B and C (SCN-20080313-015) Back
13
Committee Ref: A26, CrossRail Tunnel Alignments between Liverpool
Street and Bow Triangle (SCN-20080313-016) Back
|